Logistics site selection follows the plants and the customers.
Logistics site selection covers the buildings that hold and move goods: regional distribution centers, the warehouse beside a new plant, cold storage and facilities at a port. Each is judged on reach, labor, the building and the power behind it. We compare the markets and sites, find and check the land and buildings, and negotiate the incentives.
- Highway, rail and port or border access
- A large hourly workforce within commuting range
- Cold storage uses about five times the power
Manufacturers, retailers and logistics operators build or lease these buildings.
Manufacturers, retailers, logistics operators and cold chain companies build or lease these buildings: large regional distribution centers, cold storage plants and the warehouse that has to be ready when a new plant opens. Most companies add or move a major distribution center only a few times a decade, and the decision usually starts with a model of where inventory should sit to reach customers or plants at the lowest freight and labor cost.
Large distribution centers cluster where containers arrive, where railroads meet, where trucks cross the Mexican border and within a day's drive of large populations. The warehouse that serves a new plant follows the plant, which is why it so often has to be found in a market with little existing space. Most approvals are local: the county decides the zoning and the traffic study, and the utility sets the date power arrives.
Warehousing, cold storage and ports are covered together.
Sources U.S. Energy Information Administration, Commercial Buildings Energy Consumption Survey, table PBA4. Each industry page lists the sources for its own figures.
Mistakes that raise the cost of a logistics building.
These are taken from the industry page, where each is set out in full.
- 01 Siting the plant and leaving the warehouse for later. Near a new plant there is often no space to lease, and a build to suit cannot catch up with the start of production. We find and check the parcel or building for the warehouse at the same time as the plant site. Land, warehouse and industrial space →
- 02 Leasing a building that cannot take the automation or the cold. An existing building looks fast until the power service, floor or clear height has to be rebuilt. We check each building and parcel against the operation it will carry, including the power the utility can deliver. Land, warehouse and industrial space →
- 03 Raising incentives after the lease is signed. A county has little reason to abate taxes on a building the company has already committed to. We negotiate the package with the state and county while more than one site is still in play. Incentives and tax →
What we do for logistics projects.
A company picks a major distribution site a few times a decade, while developers, counties and utilities handle one every month. Supply chain, real estate and tax each own a piece of the decision. We work on it before the lease or the purchase: which market, which site or building, and what the state and county will offer.
- 01Site selection and relocation Markets and sites compared on drive time, labor, port or border access and what each will cost to run.
- 02Incentives and tax State and county packages for distribution and cold storage, negotiated before the lease or the build to suit is signed.
- 03Land, warehouse and industrial space Parcels and existing buildings found and checked for power, docks and access, including the warehouse that must be ready when a new plant opens.
One team works the site, the incentives, the power and the water together, and the people you meet are the people who do the work.
What people ask about these projects.
What matters most when choosing a warehouse or distribution center site?
Reach comes first: the customers or plants a truck can serve in a shift, and the distance to a port, a rail yard or a border crossing. Then a large hourly workforce within commuting range, a site or building that fits the operation, trailer parking, power, and a county that accepts the truck traffic.
Why does a new plant need its warehouse planned at the same time?
Near a new plant there is often little space to lease, and a build to suit needs land, local approvals and construction time. A warehouse left until the plant site is settled can open after production starts, so the two searches are best run together.
How much more power does cold storage need than a dry warehouse?
Federal survey data show refrigerated warehouses using about 25 to 29 kilowatt hours of electricity per square foot a year, against roughly 4 to 7 for a dry warehouse or distribution center. The utility's capacity and schedule belong early in the site search.
Tell us what the building has to hold and reach.
Name the plant or customers it serves and when the space has to be ready. We reply within two business days.
- info@auerbridge.com
- Replies within two business days
- We represent companies and advise governments, never both sides of one transaction