Site selection for data centers, fabs and energy equipment starts with power.

The group covers data center campuses, semiconductor fabs and the plants that make solar, battery, transformer and turbine equipment. Most need a very large or very reliable power supply, and the date a utility can deliver it often decides the site. We compare states and sites, negotiate the power and water supply and the incentives, and package federal financing.

A data hall in section: a row of racks on a raised floor, a cooling unit, a cable tray and the busway overhead
  • Large new campuses draw 100 to 1,000 megawatts
  • Fabs use about 10 million gallons of ultrapure water a day
  • Large power transformers weigh 100 to 400 tons
01 The market

Cloud providers, chip makers and equipment makers build these projects.

Cloud providers, AI companies and colocation developers build data center campuses. Chip makers build fabs, foundries, and packaging and test plants, and their gas, chemical and equipment suppliers follow them. Solar, battery, transformer, switchgear and turbine makers build the plants that supply the grid. Each of these companies sites a new project rarely, and an equipment maker usually does it under pressure from a backlog.

Campuses first clustered where fiber and power met near large cities, then spread to wherever a utility could still deliver hundreds of megawatts. Fabs cluster around older fabs, where trained technicians, suppliers and water systems already exist. Equipment plants split by cost: materials plants follow low cost electricity, and heavy assembly follows rail and water routes. Washington sets some credits, loans and chip incentives. The site, the power and the local terms are decided by the state, the county and the utility.

02 What these projects share

These projects are sized by power and timed by the utility.

  1. Power A large campus draws 100 to 1,000 megawatts, a fab loses wafers in a voltage dip, and polysilicon and cell plants follow cheap electricity.
  2. The utility date A site is only as good as the date the utility can deliver the load, and new lines and substations take years to build.
  3. Water Evaporative cooling and ultrapure water draw on the local system, and the county or city wants the figure before it approves water and sewer service.
  4. Room to grow Campuses and fabs are built in phases. Parcels near high voltage lines with room for later phases are few, and many are already held by other companies.
03 Industries in this group

After power, fiber, water or the freight route decides the site.

  1. Data centers and AI infrastructure Cloud, AI training and colocation campuses, sited on a utility that can deliver a city sized load on a known date. The page covers land near transmission, cooling and water, fiber, backup power, the sales tax on servers and who approves a campus.
  2. Semiconductor fabs and foundries Foundries, fabs, packaging and test plants and their suppliers. Water and wastewater capacity usually decide the site, then reliable power and still ground. The page covers suppliers, the technician workforce, room for later phases and federal chip incentives.
  3. Energy equipment, LNG and storage Plants that make solar, battery, transformer, switchgear, turbine and nuclear components. Materials plants follow cheap electricity and heavy assembly plants follow rail and water routes. The page covers the workforce, heavy buildings, the federal production credit and loans, and how LNG terminals are approved.
What each needs first
IndustryFirst requirementSecond requirement
Data centers and AI infrastructure Power100 to 1,000 megawatts for a large new campus, often built in phasesLandTens to hundreds of acres beside high voltage lines and a substation
Semiconductor fabs and foundries WaterAbout 10 million gallons of ultrapure water a day, and wastewater capacity to matchPowerAs much energy a year as about 50,000 homes, with very few interruptions
Energy equipment, LNG and storage PowerVery large for polysilicon, ingots and cells; moderate for module and battery assemblyRail, port and roadRail or barge access for products of 100 to 400 tons; interstate for modules

Sources Electric Power Research Institute, Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption; National Institute of Standards and Technology, CHIPS for America notice of funding opportunity (CARISSMA); U.S. Department of Energy, Large Power Transformers and the U.S. Electric Grid. Each industry page lists the sources for its own figures.

04 What companies get wrong

Mistakes that cost these projects time and money.

These are taken from the industry pages, where each is set out in full.

  1. 01 Data centers and AI infrastructureMaking an offer on land before the utility has confirmed it can serve the load. A parcel beside a substation is worth little if the lines behind it are full. We find and check sites for deliverable power, water and zoning before the company makes an offer, and its broker and attorney handle the purchase or lease. Land, warehouse and industrial space →
  2. 02 Data centers and AI infrastructureComparing utilities on the posted rate alone. For a very large load the cost sits in the contract: who pays for the substation, minimum payments, the delivery date and the penalty if the load arrives late. We compare grid, on site and dedicated supply and negotiate those terms with the utility. Power and water →
  3. 03 Semiconductor fabs and foundriesRanking states on the incentive offer before checking water and power. The largest package is worth little if the water system or grid cannot serve the plant on time. We compare states and sites on what each will cost to build and run, with water and power priced in. Site selection and relocation →
  4. 04 Energy equipment, LNG and storageRunning the federal loan apart from the state package. The loan, the state grant and the abatement each assume the others, and terms that conflict surface at closing. We run federal financing and the state and local package as one capital plan. Federal programs and financing →
05 How we help

What we do for technology and energy projects.

A company sites a campus, a fab or an equipment plant a few times a decade. The utilities, states and counties across the table handle such requests every year, and inside the company, real estate, tax, finance and energy each hold one piece of the deal.

All services →
  1. 01Incentives and tax Every state and local program the project qualifies for, negotiated to a signed agreement with conditions it can meet.
  2. 02Site selection and relocation States and sites compared on power, water, ground, the freight route and the workforce, and on what each will cost to build and run.
  3. 03Power and water Grid, on site and dedicated supply compared, and power, water and wastewater terms negotiated with the utility and the water provider.
  4. 04Land, warehouse and industrial space Sites near power capacity, found and checked for power, water, zoning and floor loads before an offer.
  5. 05Federal programs and financing Projects prepared for a federal loan, grant or guarantee, run alongside the state package and the private financing.

One team works the site, the incentives, the power and the water together, and the people you meet are the people who do the work.

From our work
Transaction supportCompleted

A complex transaction between two Fortune 100 companies for a new AI project

Decision
A parcel of more than 500 acres under a real estate option, part of a transaction between two Fortune 100 companies for a new AI project, with a grid demand of more than 2 gigawatts.
What we did
Retained first for site selection discovery on the parcel, then asked to find solutions to the power demand. Directly supported the transaction throughout.
Outcome
The transaction completed, and the AI project could go ahead.
A Fortune 100 technology company · Power and water
06 Questions

What people ask about these projects.

How much power do data centers, chip fabs and energy equipment plants use?

A large new data center campus draws 100 to 1,000 megawatts, the load of 80,000 to 800,000 homes. A typical fab uses as much energy a year as about 50,000 homes and needs power with very few interruptions. Polysilicon and cell plants use very large amounts; module and battery assembly far less.

How much water do data centers and chip fabs use?

An average fab uses about 10 million gallons of ultrapure water a day and needs wastewater treatment to match. A data center depends on its cooling: evaporative designs use a large amount of water, closed loop and air cooled designs far less water but more power.

Which federal programs apply to technology and energy plants?

Federal chip incentives cover fabs, packaging, materials and equipment plants and expect a state or local offer, and an investment tax credit applies to chip plants. Energy equipment makers can claim a production credit for each eligible component made in the United States, and the Department of Energy's loan office offers loans and guarantees.

Get in touch

Tell us the load, the water and the date you need them.

Name what you are building, the power and water it needs and the states you are weighing. We reply within two business days.