Heavy industrial site selection starts with the power and water supply.

Heavy industrial site selection covers steel mills, aluminum smelters, minerals refineries and chemical plants. Their sites turn on very large power and water supplies, bulk freight by rail and water, and property tax terms that last for decades. We compare the sites, negotiate the power, water and incentives, and package the federal financing.

A blast furnace with its hot blast stoves, cast house and skip incline, drawn in elevation
  • About 13,000 kWh per ton of primary aluminum
  • About 90 percent of ethane use is on the Gulf Coast
  • Arizona mines about 70 percent of United States copper
01 The market

Metals, minerals and chemical producers build these plants.

Steelmakers and aluminum producers turn scrap and ore into the metal other factories buy. Miners, refiners and recyclers turn ore and scrap into lithium chemicals, rare earth oxides, copper and battery grade graphite. Petrochemical, ammonia, industrial gas and specialty chemical producers build the chemical plants. These decisions come rarely: a metals company builds a mill or smelter perhaps once a generation, and a minerals company may build one processing plant in that time.

Arc furnace mills go where scrap, power and customers meet, and aluminum smelters go wherever a long term power contract can be had. Minerals processing plants cluster where power, rail, chemical suppliers and buyers already exist. Most base chemical capacity sits on the Gulf Coast, where pipelines, ship channels and an existing workforce sit together. Federal agencies supply much of the capital for minerals. The power, the water and the tax terms are settled with the state, the county or parish and the utility.

02 What these projects share

Every plant in this group needs power and water on a very large scale.

  1. Power Electricity is the largest running cost of a mill or smelter and one of the largest for a minerals plant. Many chemical units cannot stop safely without it.
  2. Bulk freight Scrap, alumina, reagents and product move by the trainload or barge, so rail and deep water change the cost of every ton.
  3. Water Steelmaking uses 13,000 to 23,000 gallons of fresh water per ton, a chemical plant can be the largest water user in its county, and water rights in the arid West are scarce.
  4. Large sites Hundreds of flat acres with room for rail loops, tailings or safety buffers, and few sites combine that acreage with rail, water and transmission.
  5. State permits Air and water permits for a melt shop, refinery or chemical unit are issued by the state under federal rules, and their schedule can end up setting the start date.
03 Industries in this group

Each industry is placed by a different input.

  1. Steel, aluminum and metals Electricity decides these sites, because it is the largest running cost of an arc furnace mill or a smelter. The page covers the power contract, scrap and alumina, rail and river, water, where mills cluster and who approves the plant.
  2. Critical minerals and mining The mine has to sit on the ore, so the open choice is the refinery, separation plant or recycler. The page covers power, reagents, water and tailings, the federal capital behind most projects and mine approvals on federal land.
  3. Chemicals, fertilizers and gases A natural gas or ethane pipeline at the fence narrows the search first, then deep water, water supply, power and steam. The page covers petrochemical, ammonia and industrial gas plants, why the Gulf Coast leads and how a property tax abatement works.
What each needs first
IndustryFirst requirementSecond requirement
Steel, aluminum and metals Power useMill: 300 to 525 kWh per ton of steel. Smelter: about 13,000 kWh per tonPower contractMill: often interruptible service. Smelter: firm supply for decades
Critical minerals and mining PowerTransmission level service for refining, electrowinning and graphite furnacesReagents and railSteady inbound acid, lime, soda ash and other reagents; outbound product by rail
Chemicals, fertilizers and gases FeedstockNatural gas or ethane by pipeline at the fence, from more than one supplier if possibleWater accessA deep water channel or a navigable river with docks, plus a rail spur

Sources U.S. Environmental Protection Agency, Energy Trends in Selected Manufacturing Sectors: Alumina and Aluminum; Lawrence Berkeley National Laboratory, Energy Efficiency Improvement and Cost Saving Opportunities for the U.S. Iron and Steel Industry (ENERGY STAR Guide); U.S. Energy Information Administration, Ethane consumption outlook in Today in Energy; U.S. Geological Survey, Mineral Commodity Summaries: Copper. Each industry page lists the sources for its own figures.

04 What companies get wrong

Mistakes that raise the cost of a heavy plant.

These are taken from the industry pages, where each is set out in full.

  1. 01 Steel, aluminum and metalsTreating the utility's first rate quote as the price. The first number comes before the load study, the transmission work and the contract terms, and each one moves it. We negotiate the power contract and the substation schedule while two sites are still competing. Power and water →
  2. 02 Steel, aluminum and metalsChoosing a site for its river and rail before checking transmission. A site with barge, rail and acreage can sit miles from a line able to carry the load. We score each site on the transmission and substation the utility can deliver by your start date. Site selection and relocation →
  3. 03 Critical minerals and miningPursuing one federal program at a time. Loans, guarantees, awards and purchase commitments come from different offices with terms that must fit together. We match the project to the programs that suit it and assemble them as one capital stack. Federal programs and financing →
  4. 04 Chemicals, fertilizers and gasesComparing states on the abatement rate alone. The term, the local approvals, the job and investment conditions and what the abatement leaves out matter as much as the rate. We put every offer on one basis over the life of the plant, including what each local body controls. Incentives and tax →
05 How we help

We negotiate the power contract and the incentive package together.

A company builds a new mill, refinery or chemical plant perhaps once a generation. The utilities, state agencies and federal lenders across the table handle such projects constantly. Inside the company, energy, finance and tax each hold one part of the deal.

All services →
  1. 01Site selection and relocation A scored shortlist of sites, with the transmission, rail or deep water, water supply and feedstock or reagents each one can deliver by your start date.
  2. 02Incentives and tax Abatements, payments in lieu of taxes, grants and training negotiated across competing states, on terms a capital heavy plant can meet for decades.
  3. 03Power and water Power, steam and water supply for a very large load, negotiated with the utility and water provider while more than one site is still in play.
  4. 04Federal programs and financing Federal loans, guarantees and awards matched to the project and assembled as one capital stack, with state terms that fit the loan covenants.

One team works the site, the incentives, the power and the water together, and the people you meet are the people who do the work.

From our work
Site selection and incentivesIn progress

A semiconductor chemicals supplier weighing a new site in another state

Decision
Whether to take a greenfield or a brownfield site in a different state.
What we did
Mapped the political, regulatory and economic development bodies the project would deal with and how to approach each, and analyzed the short and long term incentives available.
Outcome
A recommendation on which incentives to pursue.
A semiconductor chemicals supplier · Site selection and relocation
06 Questions

What people ask about these projects.

Which heavy industrial plant uses the most electricity?

A primary aluminum smelter. It uses about 13,000 kilowatt hours per metric ton of aluminum, roughly thirty times the 300 to 525 an arc furnace mill uses per ton of steel. Minerals refineries and chemical plants also need transmission level service.

Why are sites for heavy industrial plants hard to find?

Few sites combine several hundred flat acres with transmission, rail or deep water, and a water supply that holds through a dry year. Chemical plants also need distance from homes and minerals plants need room for tailings, which rules out most land near towns.

Where do metals, minerals and chemical plants cluster in the United States?

Most base chemical capacity sits on the Gulf Coast, where pipelines, salt caverns and ship channels meet. Arc furnace mills have spread from the Great Lakes toward the Southeast and Texas. Many mineral deposits sit in the arid West, while processing plants can go where power and buyers are.

Get in touch

Tell us what the plant will make and where you are looking.

Name the product, the states you are weighing and when you need power. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am