Chemical plant site selection starts with the feedstock pipeline.

Chemical plant site selection is narrowed first by the pipeline that brings natural gas or ethane to the fence, then by deep water, a very large water supply, power and steam, land with room for buffers, and a property tax abatement long enough to match a plant that runs for decades. We compare the sites and negotiate the abatement and the power and water supply.

A chemical process unit: two distillation columns, a pipe rack, a drum on saddles and a storage sphere, drawn in elevation
  • Feedstock by pipeline, product by ship or barge
  • Water, power and steam on the scale of a town
  • Several hundred acres, flat, above flood level, away from homes
01 What the plant needs

Gas by pipeline decides where a chemical plant goes.

Petrochemical, ammonia, industrial gas and specialty chemical producers build the plants in this table. A cracker or ammonia plant needs all of it at full scale; a gas or specialty plant beside its customer needs less land and more reliability.

RequirementTypicalWhy it decides the site
FeedstockNatural gas or ethane by pipeline at the fence, from more than one supplier if possibleGas is both fuel and raw material, and chemicals use more of it as feedstock than any other manufacturing industry.
Water accessA deep water channel or a navigable river with docks, plus a rail spurBulk product leaves by ship, barge and rail, and the largest equipment arrives the same way during construction.
Water supplyVery large and steady volumes for cooling and process, and a discharge routeA plant may be the largest water user in its county, and supply has to hold through a dry year.
Power and steamTransmission level service, often with an on site cogeneration plantMany units cannot stop safely without power, so redundancy and the date of service shape the site.
Land and buffersSeveral hundred acres or more, flat, above flood level, with distance to homesProcess safety, flood exposure and room for later units rule out most sites near towns.
Property taxA multi year abatement on the plant and equipment, approved by state and local bodiesEquipment is most of the investment, so property tax on it is one of the largest costs for decades.

Sources U.S. Energy Information Administration, Six subsectors account for nearly 90 percent of manufacturing energy consumption; U.S. Energy Information Administration, Ethane consumption outlook in Today in Energy; U.S. Geological Survey, Mineral Commodity Summaries, Nitrogen (fixed), ammonia; Louisiana Economic Development, Industrial Tax Exemption Program; U.S. Environmental Protection Agency, Prevention of Significant Deterioration basic information; U.S. Environmental Protection Agency, About Prevention of Significant Deterioration permits; ChemCologne, Chemical parks and available development space; Port of Rotterdam Authority, Our organisation; Invest Alberta, Petrochemicals and natural gas; Government of Alberta, Alberta electricity overview.

02 How the decision gets made

Most chemical plant delays come from steps taken out of order.

A producer sites a new world scale unit rarely. The steps repeat from one project to the next, and so do the places where time is lost.

  1. 01 The product and feedstock case Strategy and commercial teams decide the product, the capacity and where the feedstock and buyers are, often with partners who will co own the plant or take the output. Where it stallsThe case assumes a feedstock price, and it changes once suppliers respond.
  2. 02 The corridor screen Real estate and engineering screen corridors on pipelines, water access, existing complexes that could host the unit, and the state abatement on offer. Where it stallsGreenfield land is chosen when a site inside an existing complex would share utilities.
  3. 03 Site due diligence Engineering tests soils, flood elevation, water supply, the discharge route, the air quality designation of the area and the distance to neighbors. Where it stallsThe air quality designation is checked after the site is chosen, and the schedule moves.
  4. 04 The abatement and package Tax and government affairs negotiate the abatement contract, job grants and training with the state, while local bodies review their share. Where it stallsThe state approves the package and a local body later objects to its part.
  5. 05 Utilities and permits The power, steam and water contracts are negotiated, and the air and water permits are applied for and issued before construction begins. Where it stallsThe utility contract is left until after the announcement, when the plant can no longer walk away.
03 Where these projects go

Most base chemical plants sit on the Gulf Coast.

The Gulf Coast holds most of the country's base chemical capacity because pipelines, salt caverns, ship channels and an existing chemical workforce sit together there, and new units can join complexes that already share utilities. Fertilizer plants also follow the farm belt they supply, and gas and specialty chemical plants follow the factories they feed, including semiconductor fabs.

  1. The Texas coast Pipelines from the largest gas fields, the Houston and Sabine ship channels, and the deepest base of chemical plants and contractors in the country.
  2. The Louisiana river corridor Deep water on the Mississippi between Baton Rouge and New Orleans, gas pipelines and salt, and a long industrial property tax exemption.
  3. The Midcontinent and farm belt Ammonia and nitrogen plants close to gas in Oklahoma and to the corn growing states that buy their fertilizer by pipeline, rail and barge.
  4. Fab and factory regions Industrial gas and specialty chemical plants that sit beside semiconductor fabs and large factories in Arizona, Texas, Ohio and New York.
Abroad
  1. Germany Most chemical production sits in chemical parks run by operating companies that supply power, steam, water, wastewater treatment and services to tenants, so a new plant usually joins a park and uses its existing approvals.
  2. The Netherlands In Rotterdam the port authority, a company owned by the city and the national government, manages, operates and develops the port and its industrial area, so a chemical plant settles its site with a public landholder.
  3. Canada Alberta plants draw low cost gas and ethane through a province wide pipeline system and buy power in a competitive wholesale market, while transmission stays regulated and support is negotiated with the province.
04 Who decides

The state board and the parish grant the abatement.

Federal agencies set the standards and some of the credits. The abatement, the power and the water are settled with the state, the local bodies and the utility.

LevelBodyWhat it controls
FederalTreasury and IRSFederal energy tax credits, such as those for carbon capture, and the rules a plant has to meet to claim them
FederalEPANational air and water standards, and the permits it issues where a state has no approved program
FederalArmy Corps of EngineersPermits for docks, dredging and work in rivers and wetlands
StateState development agency and boardThe property tax abatement contract, job grants and the package, as the Louisiana Board of Commerce and Industry approves exemptions
StateState environmental agencyAir and water permits for most plants, issued under federal approval
LocalParish or county and school districtThe local share of the abatement, payments in lieu of taxes and road work
LocalUtility and water supplierThe power rate, the substation, the water contract and the dates each is delivered
ForeignHome governmentsExport credit and investment agencies that finance foreign partners who co own the plant
05 What companies get wrong

The costly mistakes happen before the site is announced.

A producer builds a new world scale unit a few times in a generation. The parish, the state board and the utility see such projects every year, and inside the company the feedstock, tax and site teams each hold one part of the deal.

  1. 01Comparing states on the abatement rate alone. The term, the local approvals, the job and investment conditions and what the abatement leaves out matter as much as the rate. We put every offer on one basis over the life of the plant, including what each local body controls. Incentives and tax →
  2. 02Treating the air permit as a step after the site is chosen. The air quality designation of a county decides which review applies and how much offsetting the plant needs. We weigh each county's designation when we compare the sites, and your counsel and engineers handle the permit itself. Site selection and relocation →
  3. 03Assuming the river next door means the water is available. Water rights, the intake, treatment and the discharge route are separate questions, and a dry year tests all of them. We negotiate the water supply and its terms before the site is committed. Power and water →
  4. 04Leaving power and steam until after the announcement. Once the site is public the utility knows the plant has nowhere else to go, and redundant service takes years to build. We negotiate the power and steam supply while two sites are still in play. Power and water →
  5. 05Buying open land when an existing complex could host the unit. A greenfield site has to build its own utilities, docks and buffers from nothing. We compare open land with space inside existing complexes and ports before the shortlist closes. Land, warehouse and industrial space →
06 How we help

Our work for chemical and fertilizer producers.

One team works the site, the incentives, the power and the water together, and the people you meet are the people who do the work.

All services →
  1. 01Incentives and tax State and parish or county abatements, payments in lieu of taxes and job grants, with terms the plant can meet for decades.
  2. 02Power and water Power, steam and water supply for a plant that will be the largest user in its county, agreed before the site is public.
  3. 03Site selection and relocation A scored shortlist that weighs feedstock, deep water, water supply, buffers and the abatement together.
From our work
Site selection and incentivesIn progress

A semiconductor chemicals supplier weighing a new site in another state

Decision
Whether to take a greenfield or a brownfield site in a different state.
What we did
Mapped the political, regulatory and economic development bodies the project would deal with and how to approach each, and analyzed the short and long term incentives available.
Outcome
A recommendation on which incentives to pursue.
A semiconductor chemicals supplier · Site selection and relocation
07 Questions

What people ask about this industry.

Why are so many chemical plants on the Gulf Coast?

Natural gas and ethane are the main feedstock for United States base chemicals, and the pipelines, storage and ship channels that carry them meet on the Texas and Louisiana coast. About 90 percent of United States ethane use is along the Gulf Coast, and new units can join complexes that already share power, steam and docks.

How does an industrial property tax abatement work?

A state or local body agrees to exempt part of the property tax on a new plant's buildings and equipment for a set number of years, usually in exchange for investment and job commitments. In Louisiana a state board approves the exemption, the governor signs the contract and parish bodies can review it. Land is usually not covered.

What permits does a chemical plant need before construction?

A new major source of air emissions needs a preconstruction air permit, usually from the state environmental agency acting under EPA approval, and the review includes the best available control technology and an air quality analysis. Water discharge permits and, for docks or wetlands, Army Corps permits are also common.

Where are ammonia plants located in the United States?

More than half of United States ammonia capacity is in Louisiana, Oklahoma and Texas, close to large natural gas supplies, which are the main feedstock. Most ammonia goes into nitrogen fertilizer, so other plants sit in the farm states that buy it.

Why do chemical and gas suppliers build next to semiconductor fabs?

A fab uses ultra high purity gases and chemicals every hour it runs. Industrial gas producers build air separation plants beside the fab and pipe gas to it, and specialty chemical suppliers locate nearby to keep supply short, steady and clean.

Get in touch

Tell us which corridors your chemical plant is weighing.

Name the states or parishes you are weighing and who will co own the plant. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am