Machinery and electronics plant site selection follows the workforce and suppliers.

This group holds plants that build machinery, equipment and automation systems, and plants that assemble appliances and electronics. Their sites turn on skilled workers within commuting distance, suppliers within a day by truck, a building that fits the line and the route finished goods take out. We compare the sites, find and check land and buildings, and negotiate the incentives and the power supply.

A machine hall in section: a bridge crane on its runway above a large bridge-type mill with a workpiece on its table
  • Welders, machinists and assemblers close by
  • Suppliers within a day by truck
  • 80,000 pounds: the federal Interstate truck limit
01 The market

Equipment makers and appliance and electronics brands build these plants.

Makers of construction, agricultural and mining equipment, industrial machinery, robots and automation systems build the machinery plants. Appliance makers, consumer electronics brands and the contract manufacturers that assemble for them build the assembly plants. A machinery maker adds a plant rarely, and its first choice is between expanding in place and opening a second plant. An appliance or electronics maker reshapes its network of plants perhaps once a decade.

Both kinds of plant go where earlier plants trained a workforce and built a supplier base, because trades and suppliers take decades to build. Agricultural equipment sits near the farm belt, mining and energy equipment near the basins that buy it, and assembly plants where interstates reach the population they serve. Federal tax and trade policy set the backdrop. The plant itself is decided by the state, the county and the utility.

02 What these projects share

These plants follow existing workers and suppliers.

  1. The workforce A machinery plant hires several hundred to a few thousand welders, machinists and technicians, and an assembly plant fills two or three shifts. Plants nearby compete for the same people.
  2. Suppliers Castings, forgings, plastics, stampings and harnesses are heavy or bulky and arrive often, so a site without suppliers within a day by truck pays more freight on every unit.
  3. Older plant regions Both cluster where earlier plants trained a workforce and built suppliers around them, in the Midwest and the Southeast, with Texas a third pull.
  4. The building Finished machines need high bays, heavy cranes and test yards, which few existing buildings offer. Assembly lines need clear height and docks, and many begin as a search for space.
  5. The package terms Job grants and abatements carry hiring terms that run for years, and an agreement written for one product can claw back money when the line changes.
03 Industries in this group

Machinery plants draw more power and ship heavier loads.

  1. Heavy machinery and automation Decided by skilled trades and by the foundries, forge shops and machine shops within a day by truck. The page covers power for welding and heat treatment, rail and heavy haul routes for machines above truck limits, and whether to expand in place or open a second plant.
  2. Consumer durables and electronics Decided by a deep pool of assemblers and a building with clear height and docks, often an existing one. Manufacturers first decide which products are assembled in the United States, Mexico or Asia, and our work is on the United States plants. The page covers the workforce, inbound components, suppliers and foreign trade zones.
What each needs first
IndustryFirst requirementSecond requirement
Heavy machinery and automation WorkforceSeveral hundred to a few thousand welders, machinists, assemblers and techniciansSuppliersFoundries, forge shops and machine shops within a day by truck
Consumer durables and electronics WorkforceHundreds to several thousand assemblers on two or three shiftsBuildingLarge single story space with clear height, truck docks and room for lines

Sources Federal Highway Administration, Size and Weight Overview. Each industry page lists the sources for its own figures.

04 What companies get wrong

Mistakes that raise what these plants cost.

These are taken from the industry pages, where each is set out in full.

  1. 01 Heavy machinery and automationCounting the labor pool without counting the competition for it. A county with enough welders on paper may already supply other plants hiring the same trades. We score each location on the skilled workers a new plant can realistically hire and train. Site selection and relocation →
  2. 02 Heavy machinery and automationLeaving the power question until the building is designed. A utility can take longer to deliver new capacity than the building takes to put up, and once the site is public it knows the plant has nowhere else to go. We compare the supply options and negotiate the power supply terms while two sites are still in play. Power and water →
  3. 03 Consumer durables and electronicsTreating an available building as a finished plant. Clear height, dock count and power at the wall decide what a line costs to install, and neighbors may already employ the workforce. We score buildings and new sites side by side on what each can deliver. Site selection and relocation →
  4. 04 Consumer durables and electronicsStarting the workforce plan after the lease is signed. State training programs need lead time to recruit and train the first shifts, and the line waits for them. We build the training program into the incentive agreement so recruiting starts first. Incentives and tax →
05 How we help

What we do for machinery and electronics plants.

A manufacturer adds a plant or redraws its network of plants once in a long while, and the state agency and the utility handle one every month. Inside the company, operations, supply chain, real estate and tax each own a piece of the decision and nobody owns all of it.

All services →
  1. 01Site selection and relocation Expansion in place, a second plant or an existing building, scored on the trades, suppliers, freight and power each site can deliver.
  2. 02Incentives and tax State job grants, training money and local abatements negotiated as one package, with hiring terms the plant can meet as the line changes.
  3. 03Land, warehouse and industrial space Sites and existing buildings found and checked for cranes, clear height, docks, power and zoning; your broker and attorney handle the lease or purchase.
  4. 04Power and water A power contract and a delivery date for welding, machining and heat treatment loads, negotiated while sites are still competing.

One team works the site, the incentives, the power and the water together, and the people you meet are the people who do the work.

06 Questions

What people ask about these projects.

What do machinery and electronics plants look for in a site?

Both look first for workers, welders and machinists for machinery and deep shifts of assemblers for appliances and electronics, and for suppliers within a day by truck. A machinery plant also needs industrial power, cranes and rail or a heavy haul road; an assembly plant needs clear height, docks and a short route to a port or the border.

Which needs more power, a machinery plant or an assembly plant?

A machinery plant. Welding and heat treatment draw large, uneven loads, and the date a utility can deliver new capacity can set the start of production. Appliance and electronics assembly uses moderate power, well below metals, chemicals or paper, and existing service is often enough.

Is an existing building a good fit for a new plant?

For assembly, often: a building with enough clear height, docks and power starts production well before a new one. For heavy machinery, less often, because finished machines need crane capacity, floor strength and outdoor space to test and stage, which few existing buildings offer.

Get in touch

Tell us the product and the capacity you need to add.

Name the product, the states you are weighing and when production starts. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am