Electronics manufacturing site selection turns on the assembly workforce.

Electronics manufacturing site selection is a search for a deep assembly workforce, a large building and short routes to components. Before it, a manufacturer decides which products are assembled in the United States, which in Mexico and which stay in Asia, and reopens that split when trade policy changes. For the United States plants, we find and compare the buildings and sites and negotiate the incentive package.

An electronics assembly line in elevation: a loader, a screen printer, two pick and place machines, a reflow oven and an unloader on one conveyor
  • Assembly lines staffed by hundreds to thousands
  • An existing building often beats a new site
  • Plants cluster where earlier plants trained the workforce
01 What the plant needs

An assembly plant needs a deep pool of assemblers.

Appliance makers, consumer electronics brands and the contract manufacturers that assemble for them build these plants. The table describes a high volume assembly plant; component plants need the same things at a smaller scale.

RequirementTypicalWhy it decides the site
WorkforceHundreds to several thousand assemblers on two or three shiftsAssemblers are the largest single occupation in electronics manufacturing, and a line runs only as fast as the local labor market can staff it.
BuildingLarge single story space with clear height, truck docks and room for linesAn existing building can start production well before a new one, so many projects begin as a search for space.
Inbound logisticsInterstate access to a container port or a Mexican border crossingMost components arrive from Asia or northern Mexico, and every day of transit is inventory the plant pays to carry.
SuppliersPlastics, metal stamping, wire harness and circuit board suppliers within a dayBulky parts are costly to ship far, so a site without a supplier base pays more freight on every unit it builds.
DistributionWarehouse space near the plant and the interstate for finished goodsRetailers expect short lead times, and finished appliances are too bulky to store or ship far without cost.
PowerModerate, well below metals, chemicals or paper; existing service often enoughSix energy intensive industries use nearly all manufacturing energy and assembly is not among them, so power rarely decides the site alone.

Sources International Trade Administration, Mexico Country Commercial Guide: Temporary Entry; Secretaría de Economía, Ventanilla Única: IMMEX program authorization; International Trade Administration, Mexico Country Commercial Guide: Power Sector; Canada Energy Regulator, Provincial and Territorial Energy Profiles: Canada; International Trade Administration, About Foreign Trade Zones; Texas Comptroller of Public Accounts, Port of Entry: Laredo; U.S. Energy Information Administration, Energy Explained: Use of Energy in Industry; U.S. Bureau of Labor Statistics, Industries at a Glance: Computer and Electronic Product Manufacturing.

02 How the decision gets made

Companies choose the country before the building.

A manufacturer reshapes its North American network of plants perhaps once a decade. The steps below follow the order most manufacturers use.

  1. 01 The network question Strategy and supply chain decide, product by product, what is assembled in the United States, what in Mexico and what stays in Asia, weighing labor, freight, lead time and the customer. Where it stallsThe split is set for one trade policy and has to be reopened when it changes.
  2. 02 The operating structure Tax, finance and counsel decide how each plant will run: an owned entity, a shelter operation in Mexico, or a foreign trade zone in the United States. Where it stallsThe structure is settled after the site, when it should have shaped the shortlist.
  3. 03 Building or site Real estate screens existing buildings and new sites on labor, clear height, docks, power at the fence and the distance to the port or the border. Where it stallsThe building fits the line but sits in a labor market other plants already claim.
  4. 04 The package Tax and government affairs negotiate job credits, training grants and property tax abatement with the state and the county, written for a product and a head count. Where it stallsThe terms are written for today's product and break when the line changes.
  5. 05 The workforce plan Human resources and the state training program recruit and train the first shifts, often through a community college, before the first unit ships. Where it stallsRecruiting starts after the lease is signed, and the first line waits for workers.
03 Where these projects go

Assembly plants cluster where older plants trained workers.

Appliance and electronics assembly in the United States clusters where earlier plants left a trained workforce and a supplier base of plastics, stampings and harnesses, and where interstates reach the population the plant serves. The border adds a second pattern: plants on the United States side that work with assembly plants across the line in Mexico. The same choice runs across the border, under different rules.

  1. Kentucky, Tennessee and the Carolinas Long established appliance plants, a supplier base built around them, state training programs and a day's drive to much of the country's population.
  2. Ohio, Indiana and Michigan The original appliance and electrical equipment base, with metal stamping and plastics suppliers and large existing buildings that can be converted.
  3. The Texas border, El Paso to Laredo Warehousing, distribution and support operations that work with border assembly plants in Mexico; Laredo carries most of the trade through Texas land ports, much of it electronics and machinery.
Abroad
  1. Mexico Export assembly runs under IMMEX, a federal authorization from the Secretaría de Economía to import components temporarily for export production, including a shelter form, and power comes from the federal state utility, so the largest questions are federal.
  2. Canada Each province has jurisdiction over electricity generation, transmission and distribution, and most have a government owned utility, so the power for a plant is settled with the province.
04 Who decides

The state and the county set most plant terms.

Federal trade policy sets the backdrop. The plant itself is decided by the state, the county and the utility, and for a Mexican plant by the federal ministry.

LevelBodyWhat it controls
FederalCommerce and USTRTrade policy and the North American trade agreement that shape where it pays to assemble
FederalFTZ BoardForeign trade zone and subzone status for plants and warehouses, chaired by the Secretary of Commerce
StateState development agencyJob credits and closing funds, as at North Carolina Commerce or the Kentucky Cabinet for Economic Development
StateState training programRecruiting and training high volume assembly workers at the state's cost, often through community colleges
LocalCountyProperty tax abatements, fees in lieu of taxes and industrial revenue bonds
LocalUtilityPower service to the building, from investor owned utilities to public power distributors
ForeignMexican ministryThe Secretaría de Economía, which authorizes IMMEX export manufacturing programs, including shelter operations
05 What companies get wrong

Mistakes that raise what an assembly line costs.

A manufacturer redraws its North American network of plants once a decade. The state agency and the utility handle a new plant every month, and inside the company supply chain, real estate and tax each own a piece and nobody owns all of it.

  1. 01Leasing the plant and leaving the finished goods warehouse for later. Finished appliances are bulky and retailers expect short lead times, so the plant needs warehouse space close by from the first shipment. We find and check the warehouse space alongside the building for the line, and your broker and attorney handle the lease or purchase. Land, warehouse and industrial space →
  2. 02Choosing the building before checking the suppliers around it. Plastics, stampings and harnesses are bulky, and a site without a supplier base within a day pays more freight on every unit it builds. We weigh each site on the suppliers within reach as well as the building itself. Site selection and relocation →
  3. 03Treating an available building as a finished plant. Clear height, dock count and power at the wall decide what a line costs to install, and neighbors may already employ the workforce. We score buildings and new sites side by side on what each can deliver. Site selection and relocation →
  4. 04Running a conversion on the package written for the old product. An agreement written for one product and head count can claw back money when the line changes. We negotiate new terms for the conversion with the state and the county before the line moves. Incentives and tax →
  5. 05Starting the workforce plan after the lease is signed. State training programs need lead time to recruit and train the first shifts, and the line waits for them. We build the training program into the incentive agreement so recruiting starts first. Incentives and tax →
07 Questions

What people ask about this industry.

How many workers does an electronics assembly plant need?

A high volume assembly plant usually needs hundreds to several thousand workers across two or three shifts. Assemblers are the largest single occupation in electronics manufacturing, so the depth of the local labor market and the state training program often decide the site more than land or power do.

Is an existing building faster than a new plant?

Usually. An existing building with enough clear height, truck docks and power can start production well before a new building is designed and built. The trade off is fit: the building may need power upgrades, and it may sit in a labor market other plants already draw on.

What is a foreign trade zone?

A foreign trade zone is a designated location in the United States where a company can use special customs procedures, such as deferring payment on imported components until goods enter the domestic market. The Foreign Trade Zones Board, chaired by the Secretary of Commerce, grants zone and subzone status to plants and warehouses.

Get in touch

Tell us which product line you want to move.

Tell us the product, its customers and the states you are weighing. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am