Automotive plant site selection turns on a very large, ready site.

Automotive plant site selection is decided by a short list of things few places can offer together: a very large site with power, water and rail, room for suppliers within an hour, a workforce a state will train, and a package whose terms the plant can meet. We compare the sites and negotiate the incentives and the power and water supply as one piece of work.

A body shop in elevation: a car body on a floor conveyor, two welding robots on pedestals and an overhead gantry
  • Megasites of 1,000 acres or more
  • Power, water and rail on day one
  • Suppliers within an hour of the plant
01 What the plant needs

An assembly plant needs 1,000 acres and a substation.

Vehicle makers, battery cell makers and tier one suppliers build the largest private factories in North America. The table describes a new assembly plant or a battery cell plant; supplier plants need the same things at a smaller scale.

RequirementTypicalWhy it decides the site
Land1,000 contiguous acres or more, flat, in one ownership, with room to expandFew sites this size exist, and fewer are under one owner with the earthwork and surveys already done.
PowerTransmission level service and a dedicated substation; cell plants need far moreThe date the utility can deliver power sets the start of production as much as construction does.
WaterMunicipal scale water and wastewater capacity, more for paint shops and cell linesA rural megasite often sits beyond the reach of the nearest system, and the extension has to be funded by someone.
Rail and roadA rail spur for parts and finished vehicles, and direct interstate accessFinished vehicles leave by rail and parts arrive in sequence by truck, so both have to work from the first shift.
WorkforceSeveral thousand production and maintenance workers within commuting distanceThe plant hires faster than a rural labor market can supply, which is why state training programs matter.
SuppliersLand and buildings for tier one suppliers within about an hourSeats, stampings, cells and modules arrive in sequence, and a site with no room for suppliers costs more every year.

Sources Tennessee Code, section 64-6-103, megasite certification; Area Development, Mega Sites Lure Big Fish; Fraunhofer Research Institution for Battery Cell Production FFB, energy consumption of battery cell factories; Federal Reserve Bank of Chicago, EVs and the North American auto manufacturing footprint; Government of Mexico, Ley del Sector Eléctrico, articles 2 and 3; Government of Jalisco, Invest in Jalisco, incentives and taxes; Natural Resources Canada, About electricity; Innovation, Science and Economic Development Canada, Canada and Ontario auto agreement; Federal Ministry for Economic Affairs and Energy, Regional policy; European Commission, Regional aid.

02 How the decision gets made

The package and the power contract are negotiated together.

A carmaker chooses a new plant site perhaps once a decade. The sequence is the same almost every time, and so are the places it stalls.

  1. 01 The network question Strategy and manufacturing decide which vehicles or cells are built where across the United States, Mexico and Canada, and what capacity the new plant has to carry. Where it stallsThe plant network is set for one trade policy and has to be reopened when it changes.
  2. 02 The state long list Real estate and a site selector screen states on megasites, labor, logistics and the package each is likely to offer. Where it stallsStates are compared on the headline incentive number before anyone checks what each site can deliver.
  3. 03 Site due diligence Engineering tests the short list: soils, utilities at the fence, rail, the road network and the land for suppliers. Where it stallsA site certified as ready still lacks the substation or the water line.
  4. 04 The package Tax, finance and government affairs negotiate job credits, training, site grants and abatements with two or three finalist states. Where it stallsThe terms the company has to meet later get less attention than the total.
  5. 05 Power and water The utility contract, the substation schedule and the water supply are negotiated in parallel with the package. Where it stallsThey are left until after the announcement, when the utility knows the site is chosen.
  6. 06 The local agreements The county or development authority votes on the abatement, the bond structure and the site work, and the board approves the project. Where it stallsThe local body learns the details late and the vote slips.
03 Where these projects go

Assembly plants cluster around earlier plants and their suppliers.

Assembly plants cluster where earlier plants built a supplier base and a trained workforce, and where states prepared very large sites in advance. Battery plants follow the assembly plants they feed and the power they need. The same logic runs across the border, where the level of government that holds the tools is different.

  1. The Southeast, from Alabama to the Carolinas States that prepared megasites, built training programs around the first plants and sit close to ports and a deep supplier base.
  2. The Great Lakes The original supplier base, engineering centers and a skilled workforce, with existing plants and sites that can be retooled for new models.
  3. Tennessee and Kentucky Central to the corridor between the Great Lakes and the Gulf, where the regional public power utility prepared and certified some of the first megasites.
  4. Texas and the Southwest Large sites, fast growing labor markets, and road and rail links to the assembly cluster in central Mexico.
Abroad
  1. Mexico States compete with land in state owned industrial parks, training and payroll tax relief. Transmission and distribution are reserved to the national utility, so the power question is settled federally and the site question in the state.
  2. Canada Electricity falls mainly under provincial jurisdiction, and several provinces own their utility. Large plants are often funded by Ottawa and the province together, so the plant is negotiated with both.
  3. Germany The federal states select projects and run the main regional investment grant, which Berlin co-funds, and every grant must fit European Union regional aid rules, which cap what each region may offer.
04 Who decides

The state and the county sign the plant package.

Federal tax and trade policy set the backdrop. The plant itself is decided by the state, the county and the utility.

LevelBodyWhat it controls
FederalTreasury and IRSFederal production tax credits for battery components, and the rules a plant must meet to claim them
FederalCommerce and USTRTrade policy and the North American trade agreement that shape where it pays to assemble
StateState development agencyJob credits, site grants and the megaproject package, as at the Georgia Department of Economic Development
StateState training programCustomized recruiting and training for the first workforce, as Georgia Quick Start provides
LocalCounty authorityProperty tax abatement, the bond structure and the site work
LocalUtilityThe power rate, the substation and the date power arrives
ForeignHome governmentsExport credit and investment agencies in the owner's home country that can finance part of the plant
05 What companies get wrong

Mistakes that raise the lifetime cost of a plant.

A carmaker sites a plant once a decade. The state agency and the utility across the table negotiate one every month, and inside the company real estate, tax and government affairs each own a piece of the deal and nobody owns all of it.

  1. 01Comparing states on the headline incentive number. The largest package often sits on the site that needs the most work or carries terms the plant cannot meet. We put every offer on one basis, net of what the site still needs and what the terms will claw back. Incentives and tax →
  2. 02Treating a certified megasite as a finished one. Certification says the land is assembled; the substation, the water line and the rail spur may still be unbuilt. We score each site on what is built and funded on the day you commit. Site selection and relocation →
  3. 03Leaving power and water until after the announcement. Once the site is public the utility knows the plant has nowhere else to go. We negotiate the power contract and the water supply alongside the package, while two sites are still in play. Power and water →
  4. 04Choosing a site with no room for suppliers. Suppliers that cannot locate nearby add freight cost to every vehicle for the life of the plant. We find and check supplier land and buildings around the anchor site before it is chosen. Land, warehouse and industrial space →
  5. 05Counting on a rural labor market to staff the plant. The plant hires several thousand people faster than a rural labor market can supply them, so the first shifts depend on people the state has trained. We negotiate the state training program into the package alongside the credits and the site grants. Incentives and tax →
07 Questions

What people ask about this industry.

How much land does an automotive assembly plant need?

A new assembly plant is usually planned on a megasite of 1,000 contiguous acres or more. The buildings use a fraction of that. The rest is for rail, vehicle storage, stormwater, buffers, future expansion and the suppliers that want to sit beside the plant.

What is a megasite?

A megasite is a very large industrial site, generally 1,000 contiguous acres or more, assembled and studied in advance so a plant can start quickly. There is no national standard: states, utilities and railroads run their own certification programs, and a certified site may still need its power, water or rail built.

What incentives do states offer automotive plants?

The usual package combines job tax credits, a state run training program, grants for site work and roads, and local property tax abatement. Each state prices these differently, and each comes with hiring and investment terms the company has to meet for years.

Why do battery plants locate near assembly plants?

Battery plants cluster near the assembly plants they supply, which shortens the trip to the line. Cell making is also energy intensive: roughly 20 to 40 kilowatt hours of energy for each kilowatt hour of cell capacity, so a cell plant goes where both the customer and the power are within reach.

Get in touch

Tell us what the new plant will build.

Name the states in play and the year production has to start. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am