Services

Power and water strategy sets what a large site pays to run.

The first question every state and utility asks is where the power and the water will come from. Our power and water strategy compares grid, behind the meter and nuclear options for one site, assesses water rights and water risk, and negotiates supply with the utility or public power board until the load and the water are under contract.

A substation: a lattice tower, a power transformer and a bus structure, drawn in elevation
  • A power and water plan a utility will sign
  • Bought first in data centers, chip fabs, metals and chemicals
01 What the service is

Each utility sets its own terms for a large load.

A utility looks at a large load before anything else, and committing power to it is the hardest part for the utility. Each utility and grid region sets its own terms for cost sharing, curtailment and when power arrives, and water is just as local. We compare the options for one site, test the water, and then negotiate the supply contract with the utility or public power board that will serve it.

  1. Power strategy for large loads Grid service, behind the meter generation, co location with an existing plant and long term purchase agreements for nuclear, gas or renewables, compared on cost, timing and risk for one site.
  2. Public power load contracts The load agreement with a public power body such as TVA, where allocation is a board vote: the generation or transmission contribution, the curtailment terms and the ratepayer protections, negotiated for the client.
  3. Nuclear and small modular reactors Reactor options evaluated for a power buyer, a campus or a utility, with the offtake and the financing structured, including federal loan programs and state funds.
  4. Water strategy and water risk Availability, rights, treatment, reuse and discharge assessed for one site, with closed loop cooling and water reporting that a utility, a community and a board can follow.
02 How it runs

Each site is tested before any supply is negotiated.

  1. 01 First call The load, the water draw and the sites in play, before any utility hears the project name. You receiveA one page read of the constraint
  2. 02 Compare the options Grid, behind the meter, co location and nuclear options for power; supply, rights, reuse and discharge for water. You receiveThe power and water options study
  3. 03 Utility and water diligence Available capacity, cost sharing, curtailment terms and when power can arrive, with the water rights and supply checked for each site. You receiveA diligence memo for each site
  4. 04 Negotiate supply Load and water terms negotiated with the utility, the public power board or the water provider for the chosen site. You receiveNegotiated load and water terms
  5. 05 Sign the contracts The load agreement signed and the water supply terms agreed, lined up with the incentive agreement and the build plan. You receiveSigned supply contracts
03 What you get

A signed load agreement and agreed water supply terms.

  1. Options study Grid, behind the meter, co location and nuclear compared on cost, timing and risk.
  2. Water risk assessment Supply, rights, treatment, reuse and discharge for the site, with the water reporting the project will need.
  3. Negotiated load agreement Capacity, cost sharing, curtailment and ratepayer terms, signed with the utility or board.
  4. Water supply terms The supply, reuse and discharge arrangements agreed with the water provider for the site.
04 Who it is for

Plants and data centers with the largest loads.

Data centers, chip fabs, mills, smelters, chemical plants and reactor developers ask for it first. Drug makers and agricultural processors lead with water.

Bought first by
Governments

Public power boards, state energy offices and water agencies sit across this table. For them we design large load and allocation frameworks, water standards and reactor programs, never on a transaction where we represent the company.

All industries →
05 Proof and reading

Related work and research.

From our work
Transaction supportCompleted

A complex transaction between two Fortune 100 companies for a new AI project

Decision
A parcel of more than 500 acres under a real estate option, part of a transaction between two Fortune 100 companies for a new AI project, with a grid demand of more than 2 gigawatts.
What we did
Retained first for site selection discovery on the parcel, then asked to find solutions to the power demand. Directly supported the transaction throughout.
Outcome
The transaction completed, and the AI project could go ahead.
A Fortune 100 technology company · Power and water
Read first
06 Questions

Questions buyers ask first.

When should we call?

Before the site is chosen. Power and water decide which sites are real, and the utility terms and water rights are much harder to change after an announcement.

Do you build or operate generation?

No. We compare the options, structure the contracts and negotiate supply with utilities and public power boards. Developers and utilities build and run the plant, and we work alongside your counsel and engineers.

Do you also advise utilities and states?

Yes, on large load frameworks, water standards and reactor programs. We represent companies and advise governments and utilities, never both sides of one transaction.

Is small modular nuclear realistic for our campus?

Sometimes, depending on the developer, the fuel and when power is needed. We evaluate it alongside grid, gas and co location options and structure the offtake and financing if it fits.

Get in touch

Send us the load and the sites you are weighing.

Include the water draw if you know it. We reply within two business days, before any utility needs to hear your name.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am