Heavy equipment manufacturing site selection starts with the skilled trades.

Heavy equipment manufacturing site selection turns on four things: welders, machinists and technicians within commuting distance, a supplier base of castings, forgings and machined parts, power for welding and machining lines, and a way out by rail or heavy haul road for machines that weigh more than a truck may legally carry. We compare the sites and negotiate the incentives and the power supply together.

A machine hall in section: a bridge crane on its runway above a large bridge-type mill with a workpiece on its table
  • Machinists cluster in the upper Midwest
  • 80,000 pounds: the federal Interstate truck limit
  • Foundries concentrated in the Midwest
01 What the plant needs

Skilled trades and nearby foundries decide the site.

Makers of construction, agricultural and mining equipment, industrial machinery, robots and automation systems build these plants. Machinery manufacturing employs more than a million people in the United States. The table describes a final assembly and fabrication plant; component plants need the same at a smaller scale.

RequirementTypicalWhy it decides the site
WorkforceSeveral hundred to a few thousand welders, machinists, assemblers and techniciansSkilled trades take years to train, and a plant that has to build its workforce from nothing starts slowly and pays more.
SuppliersFoundries, forge shops and machine shops within a day by truckCastings, forgings and machined parts are heavy and arrive often, so distance to the supplier base adds cost to every unit.
PowerIndustrial service with capacity for welding, machining, heat treatment and paint linesWelding and heat treatment draw large, uneven loads, and the date a utility can deliver new capacity can set the start of production.
Rail and roadA rail spur or heavy haul route for loads above the 80,000 pound limitLarge machines often exceed federal truck limits, so each oversize move needs a state permit and a route that can carry it.
Land and buildingA large, flat site with high bays, heavy cranes and outdoor test and storage yardsFinished machines need crane capacity, floor strength and space to test and stage, which few existing buildings offer.
TrainingA community or technical college with welding, machining and mechatronics programsState and college training programs are how a plant fills its second and third shifts once the local pool is hired.

Sources U.S. Bureau of Labor Statistics, Industries at a Glance: Machinery Manufacturing; U.S. Bureau of Labor Statistics, Occupational Employment and Wages: Machinists; U.S. Bureau of Labor Statistics, Occupational Employment and Wages: Welders, Cutters, Solderers and Brazers; U.S. Bureau of Labor Statistics, Occupational Outlook Handbook: Machinists and Tool and Die Makers; American Foundry Society, Industry Statistics; Federal Highway Administration, Size and Weight Overview; Federal Highway Administration, Oversize and Overweight Permit Report; Germany Trade and Invest, Machinery and Equipment Industry; Germany Trade and Invest, Grants for Investments; U.S. International Trade Administration, Mexico Country Commercial Guide: Power Sector.

02 How the decision gets made

The first choice is expansion or a second plant.

A machinery maker adds a plant rarely. The steps repeat, and so do the places they stall.

  1. 01 The capacity question Operations and finance decide how much more the company has to build, which products move, and whether the answer is an expansion in place or a new site. Where it stallsExpanding in place is assumed to be cheaper without testing whether the local labor market can supply it.
  2. 02 The labor screen Human resources and a site selector map where welders, machinists and technicians live, what they earn, and which colleges train them. Where it stallsHeadcount is counted, but the plants already competing for the same trades are not.
  3. 03 Suppliers and freight Supply chain and logistics test each candidate against the foundries, forge shops and machine shops it depends on, and the routes finished machines take out. Where it stallsThe heavy haul route and rail access are checked after the site is chosen.
  4. 04 Site and power Engineering checks the land, the building, the crane loads and the power a utility can deliver to the site, and when. Where it stallsThe utility's delivery date arrives after the building is finished.
  5. 05 The package Tax and government affairs negotiate state job grants, training funds and local property tax abatement with the finalist locations. Where it stallsThe headline total gets attention and the hiring terms behind it do not.
  6. 06 The local agreements The county or city votes on the abatement, road and utility work, and the company board approves the project. Where it stallsLocal officials learn the details late, and the vote slips.
03 Where these projects go

Machinery plants go where the trades already are.

Heavy equipment plants cluster where earlier plants trained generations of welders and machinists and built a supplier base around them. Agricultural equipment sits near the farm belt it serves, mining and energy equipment near the basins that buy it, and automation makers near the factories they equip. New plants still go where the trades and the castings already are, because both take decades to build.

  1. The upper Midwest Michigan, Indiana, Wisconsin and Minnesota have the highest concentration of machinists in the country, and the region holds many of its foundries.
  2. Ohio, Illinois and Pennsylvania A deep base of foundries, forge shops and machine shops, rail on every side, and long standing equipment plants that can be expanded.
  3. The Southeast, from Georgia to the Carolinas Large sites, growing labor markets, state run training programs and ports for export, which draw new and relocated assembly plants.
  4. Texas and the Plains Texas has the largest welding workforce of any state and the Dakotas a high share of welders, close to energy, mining and farm customers.
Abroad
  1. Germany Machinery is Germany's largest industrial employer and mostly small and midsize firms. Regional investment grants are set within European Union rules, offered only in designated regions and applied for through the federal state before the project begins.
  2. Mexico Transmission and distribution are run by subsidiaries of the national state utility, so the power question for a heavy plant is settled with a federal enterprise; in the United States it is settled with a local utility.
04 Who decides

The state signs the package and the oversize permits.

Federal tax and trade policy set the backdrop. The plant itself is decided by the state, the county and the utility.

LevelBodyWhat it controls
FederalTreasury and IRSDepreciation and tax rules for new production buildings and equipment
FederalCommerceTrade policy on steel, castings, components and imported machinery
StateState development agencyJob grants and closing funds, such as the North Carolina Job Development Investment Grant
StateState training programRecruiting and training welders, machinists and technicians, often through community colleges
StateState roads departmentOversize and overweight permits for finished machines, and road upgrades to the site
LocalCounty or cityProperty tax abatement, site roads and water, and the local vote
LocalUtilityThe industrial rate, new capacity at the site and the date it is delivered
ForeignHome governmentsExport credit and investment agencies in an overseas owner's home country that can finance a plant
05 What companies get wrong

Where machinery makers lose money on a new plant.

A machinery maker adds a plant once in a long while. The state agency and the utility across the table handle one every month, and inside the company operations, real estate and tax each own a piece of the decision.

  1. 01Counting the labor pool without counting the competition for it. A county with enough welders on paper may already supply other plants hiring the same trades. We score each location on the skilled workers a new plant can realistically hire and train. Site selection and relocation →
  2. 02Assuming expansion in place is the cheaper answer. An existing plant may be out of trades, power or room, and the gap shows up after the money is spent. We compare expansion with a second site on the same terms before the choice is made. Site selection and relocation →
  3. 03Checking the heavy haul route after the site is chosen. A plant whose machines cannot leave by rail or a permitted heavy route pays for it on every shipment. We find sites and buildings with rail or a heavy haul route out and check the power, water and zoning on each. Land, warehouse and industrial space →
  4. 04Leaving the power question until the building is designed. A utility can take longer to deliver new capacity than the building takes to put up, and once the site is public it knows the plant has nowhere else to go. We compare the supply options and negotiate the power supply terms while two sites are still in play. Power and water →
  5. 05Comparing packages on the headline number. Job grants and abatements carry hiring and investment terms that run for years and claw back when missed. We put every offer on one basis, net of what its terms will cost the plant, and negotiate the package to a signed agreement with terms the plant can meet. Incentives and tax →
07 Questions

What people ask about this industry.

What does a heavy equipment manufacturing plant need in a site?

It needs a skilled workforce of welders, machinists and technicians, foundries and machine shops within a day by truck, industrial power for welding and heat treatment, and rail or a heavy haul road. The building needs high bays, heavy cranes and outdoor yards for testing and staging finished machines.

Where are heavy equipment manufacturers located in the United States?

Most cluster in the Midwest, where machinists are most concentrated in Michigan, Indiana, Wisconsin and Minnesota and where many foundries sit. Others are in Ohio, Illinois and Pennsylvania, the Southeast, and Texas and the Plains, close to farm, energy and mining customers and to large welding workforces.

How are oversize machines shipped from a plant?

Federal law limits trucks on the Interstate system to 80,000 pounds gross weight, and many finished machines exceed it. The federal government issues no oversize or overweight permits; each state issues its own. That is why rail access and an approved heavy haul route matter when the site is chosen.

Why is skilled labor the main constraint for machinery plants?

Machinist apprenticeships combine paid work with technical instruction and often last several years. Machinery manufacturing employs about a fifth of the country's machinists, so a new plant competes with existing plants and machine shops for the same people.

What incentives do states offer machinery plants?

The usual package combines a state job grant or tax credit, state funded training through community and technical colleges, and local property tax abatement, sometimes with road or utility work at the site. Each comes with hiring and investment terms the company has to meet for years.

Get in touch

Tell us how much more you need to build.

Name the product, the states you are weighing and the capacity you need. We reply within two business days.

  • info@auerbridge.com
  • Replies within two business days
  • We represent companies and advise governments, never both sides of one transaction
I am